Innovation Project

H2 readiness

Pilot project for the conversion of a local network to hydrosserfung operation

Hydrogen production

In a pilot project, the possibility of converting a commercial local network to hydroseration operation to supply private households is being examined in more detail. The local network with a total line length of 3,060 meters includes 147 gas house connections and a gas pressure regulating and measuring system (GDRM) for the pressure reduction from 400 mbar to 50 mbar.

More Information

Project details

Project responsibility

ENERVIE Networked

Duration

Funding amount

Funded by